In the period from February to August 2019, the 4 groups of the construction works were performed on the building and in the park of the Visitor Center The Drava Story, with a total value of HRK 3,309,723.26.
Group I – the construction adaptation of the basement of the building to the planned multimedia set up.
Group II – the landscaping, the construction of auxiliary buildings and expansion of facilities for visitors – the construction of a lookout and wooden promenade, souvenir shop and storages for canoes and bicycles, the renovation and construction of fence, the reconstruction of the well, the construction of the new paths and the playground, Garden of fragrant experiences, educational vegetable garden, planting labyrinth in the shape of an owl and planting the orchard of the old varieties
Group III – the construction of a winter garden - in the attic of the building, part of the roof was reconstructed in order to build another additional content for visitors - a winter garden. It is an interpolation that allows visitors to interact with the protected park and view the Drava River, especially when the weather is unsuitable for staying outdoor. In the winter garden there is an interpretation of the water habitats in the area of the Mura Drava Regional Park and the Mura Drava Danube Biosphere Reserve
Group IV - adaptation of the Center for people with disabilities and reduced mobility - existing and new pedestrian paths in the park are covered with wooden forms to allow people with disabilities to have an undisturbed tour, info-educational boards with Braille signs are installed, lifting platforms are installed for access to the attic and basement of the building and the sanitary facilities in the building have been adapted.